OUR STORY
Fifty years making boards in Oklahoma
WestOak was started in 1973 by an engineer who had come out of Bell Labs. Five decades later the work still happens in Oklahoma, at two sites, by people who have been standing at those benches for most of their careers.
1973
FOUNDED
167
COMBINED YEARS ON THE FLOOR
0.11%
RETURN RATE
30,000
SQ FT · TWO FACILITIES
THE ROUTE SO FAR
One continuous run, 1973 to now
Follow the trace down the page.
WHERE IT HAPPENS
Two Oklahoma floors, no offshore step
Everything from bare-board artwork to a finished, tested unit happens inside these two buildings. Nothing gets shipped out and shipped back.

Tulsa - Headquarters
SMT and through-hole lines, cable and harness, box build, test and inspection, and the engineering bench where DFM reviews happen.
Role
Headquarters & primary production
Capabilities
All six, under one roof
Opened
2024

Erick — Second Facility
Added capacity for recurring, higher-volume production, run to the same standards and the same documentation as Tulsa.
Role
Additional production capacity
Capabilities
All six, under one roof
Opened
1973
